LOCATION
Kwinana, Western Australia
CATEGORY
Heat Exchanger Fabrication
INDUSTRY
Mining - Refining
VALUE
Up to $500k
Scope of Work
Project Resourcing
The project team included:
- Project Management
- Quality Management
- 3D Scanning Engineer
- Project Supervision
- Boilermaking and Coded Welding Personnel
Fabrication
Project Achievements
The project required APMS to maintain a close working relationship with our client throughout the fabrication process to ensure there were no delays in resolving technical issues and the completed unit was delivered on schedule to coincide with the shutdown window for change-out.
The Cooler fabrication was completed without accident or incident to the required technical and quality standards, on time and on budget. The unit was installed without incident and our client provided positive feedback on the quality of the end product and professionalism of our project team throughout the project.
- Zero recordable incidents or accidents throughout the duration of the project.
- Extensive interaction with our client to ensure timely resolution of numerous technical issues.
- Achieved dimensional tolerances required to allow for a seamless changeout when connecting to existing pipework on site.
This project was delivered across a 7 month duration, with the sourcing of finned tubes to meet the project schedule being particularly challenging.
Key Activities
The success of the project was dependant on the successful execution of the following activities:
- Preparation of Autocad drawings.
- Material procurement.
- Coded Tungsten Inert Gas (TIG) welding to AS3992.
- 3D scanning of header boxes to confirm inlet/outlet positions correspond with existing connecting pipework.
- Mechanical expansion of tubes into grooved tubesheet holes.
- Successful NDT (10% RT, PT and 100%visual inspection) and hydrotesting of the tube bundle.
- 100% material and weld traceability.
- Coordination of multiple subcontractors including non-destructive testing (NDT), hydro testing, blasting & painting and logistics arrangements.
- Liaise with the client to ensure Manufacturers Data Report (MDR) contained the information required for future reference including as built information and drawing updates.